What We Do

Services

Everything we build, fix and finish, from the footings up.

Home › Services

Everything we take on

Every job below is one we do ourselves across Corona.

Deck Installation

We build new decks from the footings up, sizing joists and beams to span tables rather than guessing at lumber size. Ledger boards get flashed and bolted to the rim joist correctly, since that connection is where most deck failures start. Pressure-treated pine, cedar, redwood or composite decking go on top depending on budget and how much upkeep you want to deal with later.

Deck Repair

Soft boards, wobbly rails, and posts that have started to lean all get fixed without necessarily tearing out the whole deck. We check the framing underneath first, since a loose rail is often a symptom of a rotted post, not a problem with the rail itself. Rusted joist hangers and fasteners get swapped for galvanized or stainless hardware while we're in there.

Deck Staining & Sealing

Corona sun turns untreated wood gray and brittle within a couple of summers, especially on decks that face south or west with no shade. We pressure wash, let the wood dry fully, then apply a stain and sealer rated for the UV and heat out here. Doing this every two to three years keeps the boards from checking and splitting.

Custom Deck Design

Multi-level decks, built-in benches, and layouts that match the house's rooflines and trim all get planned before a single footing goes in. We work from how you actually use the yard, grilling, seating, a hot tub, rather than a generic rectangle. Drawings get sketched out up front so you know what you're approving before it's built.

Deck Resurfacing

When the framing underneath is still solid but the decking boards are cupped, splintery or just worn out, we strip the old boards and install new ones on the existing structure. This costs less than a full rebuild and takes a fraction of the time. It's also a common point to switch from wood to composite without touching the framing at all.

Composite Decking Installation

Composite boards from brands like Trex and TimberTech skip the sanding, staining and splinters that come with a wood deck. Hidden fastener systems keep the surface free of screw heads, which also helps with drainage between boards. Composite does get hot underfoot in direct summer sun, which is worth knowing before you commit to a dark color.

Deck Railing Installation & Repair

Railings get built to code height, typically 36 to 42 inches depending on deck height, with balusters spaced so a 4 inch sphere can't pass through. Wobbly rails usually trace back to a loose post connection rather than the rail cap itself. Wood, metal, and cable rail systems are all options depending on the look you're after.

Deck Framing & Structural Repair

Joist hangers rust, ledger boards rot where they meet the house, and footings shift in our clay soil if they were poured too shallow. We dig new footings below the point where the soil moves seasonally and resize beams if the original framing was undersized for the span. This is the work that decides whether a deck is safe to stand on, even if it doesn't show from the surface.

Deck Demolition & Removal

Old decks get torn out board by board, with nails and screws pulled or cut flush so nothing gets left in the dirt. Lumber and debris get hauled off the same day in most cases. This usually happens right before a new deck goes in, but it's also booked on its own when a deck just needs to come down.

Deck Pergolas & Covers

A pergola or solid cover over a deck cuts down on direct sun, which matters on a deck that faces west and gets hit all afternoon. Posts tie into the existing deck framing or get their own footings if the structure underneath wasn't built to carry the extra load. Lattice, solid roof panels and retractable fabric covers are all options depending on how much shade you actually want.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Corona, CA

Deck crews working across the Inland Empire, not just Corona.

Corona, CA
Anaheim, CA
Riverside, CA
Santa Ana, CA
San Bernardino, CA
Moreno Valley, CA
Fontana, CA
Ontario, CA
Rancho Cucamonga, CA
Chino, CA
Yorba Linda, CA
Common Questions

Things worth asking

Questions that come up once a project actually gets going.

Do I need a permit to build a deck?
Most decks attached to a house, or built more than 30 inches above grade, require a building permit in Riverside County and the cities around it. Permit requirements include a footing inspection before concrete gets poured and a framing inspection before the decking boards go down.
How long does a typical deck project take?
A straightforward deck installation usually takes one to two weeks from the first footing to the final board, weather and permit scheduling allowing. A full rebuild with multiple levels or a roof cover attached takes longer, often three to four weeks.
Can a deck be built to a set budget?
A deck can be designed around a target budget by adjusting size, decking material, and railing style rather than cutting corners on the framing. Pressure-treated pine costs less than composite or redwood, and that difference is usually the easiest place to adjust the number.
Is the work guaranteed?
Workmanship on framing, decking and railings is covered by a warranty period, and manufacturer warranties on composite decking or hardware carry their own separate coverage, often 20 to 25 years. Specific warranty terms are listed in the written quote.
Who do I deal with once the work starts?
One point of contact handles scheduling and questions for the length of the project, rather than the homeowner getting passed between crew members. That same person is reachable by phone once the job is underway.
What decking materials do you work with?
Pressure-treated pine, cedar, redwood, and composite brands like Trex and TimberTech are all common choices for deck surfaces. Pressure-treated pine costs the least but requires restaining every two to three years, while composite costs more upfront and requires very little maintenance.
Can I stay in my house during deck construction?
Living in the house during deck construction is normal, since most of the work happens outside and doesn't touch the home's interior. The main disruption is noise from saws and nail guns during framing, plus a work vehicle in the driveway.
What should I do to prepare the yard before work starts?
Furniture, grills, planters and anything breakable should be cleared from the work area before a deck project starts. Gate access for equipment and a marked location for utility lines, like sprinkler heads or a gas line, also helps the crew avoid surprises.
What happens if you find rot or damage once the old deck comes off?
Hidden rot in a ledger board, rim joist or support post sometimes only shows up once the old decking is pulled up, and that gets flagged before new material goes down. Any extra repair cost gets discussed and approved before the work continues, rather than appearing as a surprise on the final bill.
How do I take care of a new deck once it's finished?
Wood decking requires restaining every two to three years depending on sun exposure, with more frequent care on a south-facing deck that gets full afternoon sun. Composite decking just gets a regular wash with soap and water to keep dirt and mildew from building up on the surface.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (909) 343-5931